You don't have javascript enabled. Good luck with that.
Pencarian
Penutupan Perlintasan Sebidang Kereta Api Senen Tidak Efektif

Train Crossing Closure in Senen Complained By Locals

A train crossing on Jl Letjen Suprapto, Bungur, Senen, Central Jakarta that was shut down on Saturday (10/1) by Transportation Ministry through General Directorate of Railways is deemed ineffective, because it leads to traffic jam.

It's ineffective, because traffic jam moves to Jl Kepu Selatan

Guntur (33), a motorcycle disclosed, he did not know the train crossing that has been shut down. He wanted to go to Jl Kalibaru Timur and had to get around pass on Jl Kepu Selatan.

"It's ineffective, because traffic jam moves to Jl Kepu Selatan," he told, when being met in Senen area, Monday (3/10).

No Train Doorstop, Train Crossing in Bojong Raya Prone to Accident

Similar statement also came out Sharul (26). He said, the alternative road cannot accommodate the vehicle volume. As a result, it leads to traffic jam from Jl Bungur Besar Raya towards Jl Kepu Selatan.

Meanwhile, Head of Central Jakarta Transportation Sub-dept, Harlem Simanjuntak disclosed his side is still conducting a trial. Hence, so far, his side still uses Jl Krepu Selatan as alternative road.

"Trial itself takes one month. Indeed, Jl Krepu Selatan was previously jammed. After it is done, there will be evaluation," he stated.

As for the information, such closure is in accordance with Law No. 23/2007 on Railways. In article 91 paragraph 1, the law reveals train crossing with road must be made not plot.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye800 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye534 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye479 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye412 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye391 personAnita Karyati