You don't have javascript enabled. Good luck with that.
Pencarian
Penutupan Perlintasan Sebidang Kereta Api Senen Tidak Efektif

Train Crossing Closure in Senen Complained By Locals

A train crossing on Jl Letjen Suprapto, Bungur, Senen, Central Jakarta that was shut down on Saturday (10/1) by Transportation Ministry through General Directorate of Railways is deemed ineffective, because it leads to traffic jam.

It's ineffective, because traffic jam moves to Jl Kepu Selatan

Guntur (33), a motorcycle disclosed, he did not know the train crossing that has been shut down. He wanted to go to Jl Kalibaru Timur and had to get around pass on Jl Kepu Selatan.

"It's ineffective, because traffic jam moves to Jl Kepu Selatan," he told, when being met in Senen area, Monday (3/10).

No Train Doorstop, Train Crossing in Bojong Raya Prone to Accident

Similar statement also came out Sharul (26). He said, the alternative road cannot accommodate the vehicle volume. As a result, it leads to traffic jam from Jl Bungur Besar Raya towards Jl Kepu Selatan.

Meanwhile, Head of Central Jakarta Transportation Sub-dept, Harlem Simanjuntak disclosed his side is still conducting a trial. Hence, so far, his side still uses Jl Krepu Selatan as alternative road.

"Trial itself takes one month. Indeed, Jl Krepu Selatan was previously jammed. After it is done, there will be evaluation," he stated.

As for the information, such closure is in accordance with Law No. 23/2007 on Railways. In article 91 paragraph 1, the law reveals train crossing with road must be made not plot.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1416 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1009 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye988 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye783 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye681 personDessy Suciati